hrlogo64.gif (25764 bytes)
Completed Projects

Instructions:  You may click on the small pictures to view a larger image.
NOTE:  Special Instructions:  When you view the larger image, a second smaller window will appear in the left corner of your screen.  You must click Back to Hollister Roofing Projects or close the additional second window to be able to Click and view another image.

sS5ginger.gif (3618 bytes) 40 Year Presidential with the color Weathered Wood. 
sClass3.gif (3840 bytes) Class A  heavy Cedar Shake.   Class A is a 2 step process:  Class B is a  fire treated cedar shake that is used with Densdeck sheeting, thus becoming Class A.
ss4shake.gif (3178 bytes) A Staggered Cedar Shake roof  with a medium thickness.
ss12tile.gif (2919 bytes) A Terra Cotta Spanish S tile installed on a new house.
ss3pwoodb.gif (3817 bytes) 40 Year Presidential Composition with a 2 color blend of Woodtone and Bark Brown.
ssupplies.gif (2920 bytes) Supplies (plywood and paper)  being delivered after Tornado Tear Off removed the old roof (wood shakes).
sseq10.gif (4053 bytes) Tornado Tear Off, Inc. removing a foam roof at Hartnell College.  There was up to 18 inches of foam removed in some areas, thus Tornado Tear Off made use of a special type of rototiller.
sS11tar.gif (2785 bytes) High Performance Membrane Roofing (Hypsam) installation.

 

Below is the Sunnyslope Medical Building job from start to finish.  A hot tar and gravel roof was removed by Tornado Tear Off, Inc and replaced with hot tar and capsheet by Hollister Roofing.
Instructions:  You may click on the small pictures to view a larger image.
NOTE:  Special Instructions:  When you view the larger image, a second smaller window will appear in the left corner of your screen. 
You must click Back to Hollister Roofing Projects or close the additional second window to be able to Click and view another image.
sseq1.gif (3572 bytes) Sunnyslope Medical Building.  Picture is of old roof before removal and new roof installation.
sseq2.gif (3340 bytes) The roof after the old tar and gravel is removed from the roof and also from the siding.  Removal completed by Tornado Tear Off, Inc.
sseq3.gif (3578 bytes) A tapered insulation system was installed to prevent ponding and also enhances drainage.
sseq4.gif (3597 bytes) Hollister Roofing crew mopping on the capsheet over the fiber glass ply.
sseq5.gif (3449 bytes) Installation of tar paper on the parapet wall in preparation for a new wood siding.
sseq6.gif (3429 bytes) Hollister Roofing installed a new wood siding on the parapet wall around the entire roof.
sseq7.gif (3673 bytes) Hollister Roofing paints the new wood siding.
sseq8.gif (2619 bytes) Hollister Roofing crew adds final details prior to completing the Sunnyslope Medical Building.
sseq9.gif (2721 bytes) Hollister Roofing completes the new roof for the Sunnyslope Medical Building.

email: info@hollisterroofing.com
redUp.gif (840 bytes)

Home About Hollister Roofing About Tornado Tear Off, Inc.
Products & Services Finished Projects Message to Current Clients

Web Site design: Cadm MultiMedia Productions  Email CMP